We were originally contracted to install a synthetic pre-cast veneer cladding for the cornices and rake details, a hard-coat stucco system at the gables, and fiber cement siding at the roof wells.
When the synthetic veneer manufacturer came across scheduling issues (couldn't meet to schedule), we came in to save the day by offering EIFS as a solution. After employing some creative techniques to match the architectural design, the result was a cost savings for Christopher Newport 's 400-plus room dormitory without dragging out the original time frame.